Sun, 8 Nov 2026

Stockland puts two Alkimos Beach Hut designs to a community vote

Stockland is reimagining the Alkimos Beach Huts removed a year ago, with two designs up for a resident vote and construction due to start in 2027.

Last verified · How we report · Report a correction

Illustration for: Stockland puts two Alkimos Beach Hut designs to a community vote
2design concepts
1,300petition signatures
2027construction start

Stockland is asking Alkimos residents to choose between two designs for replacement Alkimos Beach Huts, with a community pop-up held on Saturday 7 November and a second set for Wednesday 11 November, according to PerthNow’s community news report published on the weekend.

Why it matters

The original huts at Alkimos Beach, in Perth’s northern suburbs, were removed about a year ago, and PerthNow reports residents are still upset about it. The report says Caitlin Moore, a local resident, launched a petition last year to keep them, which gathered around 1300 signatures.

The approvals and deals moving Perth. Free, every weekday.

Stockland told PerthNow it wanted the community to have a say in what comes next. Its spokesperson acknowledged the huts mattered a great deal to many locals.

The numbers

PerthNow reports the following details:

  • Two design concepts will be shown to residents, who can then vote for the one they like best.
  • The report places the new huts along Bather’s Promenade, across from the Bather’s Park playground.
  • Construction is expected to start in 2027.
  • The first pop-up runs at Picasso Park in Alkimos on Saturday 7 November, from 10am to noon.
  • The second is in Alkimos, at Gateway Shopping Centre, on Wednesday 11 November, 2.30pm to 4.30pm.

Stockland says it will draw on resident feedback when settling the final design. Separately, in New South Wales, the developer’s 235-home Halcyon Braemar land lease project was declined state fast-track.

What’s next

Voting happens at the two November pop-ups, after which Stockland says the feedback will shape the final design. PerthNow reports construction is expected to start in 2027. The report does not give a cost, a delivery date or a planning approval status for the new huts.

On why the originals went, PerthNow reports Stockland said they stood on privately owned land that neither it nor DevelopmentWA controlled, and that the landowner asked for them to be taken away. Stockland said relocation was explored, but the huts were judged neither safe nor viable to move because of their age and condition. PerthNow reports the old hut site is set to become a drive-through Grill’d restaurant.

Ms Moore told PerthNow she was glad the huts will be rebuilt but said that does not undo what happened, and she raised concerns about parking at the site. She said she hopes the new huts are built with enough thought to last, and that other local landmarks get better protection from now on.

Source: PerthNow, Northern Suburbs Weekly report. The Australian Developer has not independently verified the details.

Quick answers

What is the latest on Stockland?

Stockland is reimagining the Alkimos Beach Huts removed a year ago, with two designs up for a resident vote and construction due to start in 2027.

What are the key numbers in this story?

design concepts: 2; petition signatures: 1,300; construction start: 2027.

Where does this information come from?

This story cites PerthNow (Community News). Every source is linked on the page.

Sources

How we report →

Filed by the AusDev Perth Desk. How we report.

Next story · PerthAlkimos Aquatic Centre, $88m, opens to the public 14 DecemberThe $88m Alkimos Aquatic and Recreation Centre in the City of Wanneroo opens to the public on 14 December, after a 3 December ceremony and two open days.
Newsletter

Get the Perth Daily Index

One free briefing every weekday morning.