QCAT Revives Mount Gravatt East Warranty Claim After Builder Collapse

Nine structural defects, a builder in liquidation and an engineering report the regulator said it never received: the tribunal sent the claim back.

Edited by Hannah Kelly · How we report
The Daily IndexEvery Brisbane deal, approval and collapse, in your inbox each morning.Get it free →
9structural defects in the engineer's report
550 mmdeepest washout cavity under slabs
$200,000standard home warranty cap
25 SepQCAT decision date

A Mount Gravatt East homeowner whose builder went into liquidation has won a second chance at a home warranty payout. The Queensland Civil and Administrative Tribunal (QCAT) set aside the Queensland Building and Construction Commission’s (QBCC) rejection of the claim on 25 September and sent it back to the regulator to be reconsidered on its merits, Insurance Business Australia reported on 7 October.

Neither the homeowner nor the builder is named in the report.

Why it matters

When a builder collapses, the Queensland Home Warranty Scheme is the homeowner’s main route to getting defects fixed. This case shows a claim failing first on paperwork rather than substance.

An engineer’s report from April 2023 identified nine structural defects. They included retaining walls built contrary to the approved designs, no surface water drainage around the foundations, bracing piers buried in soil, and washout cavities up to 550 millimetres deep under footpath slabs. The report went to the QBCC on 3 May 2023. The QBCC later said in its statement of reasons that it had no record of receiving it, and rejected the claim in July 2024.

QCAT found the QBCC had in fact received the report and that completing the standard complaint form was not mandatory. It also reclassified the defects as structural rather than non-structural, which brought the claim inside the time limit. The tribunal said consumers cannot be expected to be aware of the siloed operations of the QBCC.

The numbers

  • Engineer’s report: April 2023, nine structural defects.
  • Report given to the QBCC: 3 May 2023.
  • Builder in liquidation: by late 2023.
  • QBCC rejection: July 2024.
  • QCAT decision: 25 September 2026.
  • Standard rectification cap under the scheme: $200,000.

What’s next

The QBCC must now assess the claim on its merits. For builders and certifiers, the decision is a reminder that the structural versus non-structural label drives the time limit, and that a defect notice in any form can count. For buyers of homes from builders now in liquidation, it means a rejected claim is worth testing at QCAT. More Brisbane distress coverage.