Tue, 24 Nov 2026

Canberra Civic arena brief faces 18-month re-test after Brave sellouts

An ACT Government official told an Assembly committee the Civic arena's seat brief will be re-examined during an 18-month design and costing stage.

Last verified · How we report · Report a correction

Illustration for: Canberra Civic arena brief faces 18-month re-test after Brave sellouts
18 monthsdesign stage
9,000concert capacity
3,000AIS Arena seats

An ACT Government official told an Assembly committee earlier in November that the seat count for the planned Civic arena will be tested again during an 18-month design and costing stage, according to a Canberra Times report published on 23 November.

Why it matters

The arena is part of the convention centre entertainment precinct, which the Territory has described as including an indoor venue for sport and music. The first design brief, covering the 7,500 seats set out in the earlier convention centre announcement, is now open to change.

The approvals and deals moving Canberra. Free, every weekday.

Independent MLA Thomas Emerson raised the question at the Assembly’s economics, industry and recreation committee. He noted the National Basketball League has called for a venue of room for 8,000 or more spectators should Canberra land a men’s expansion side. He also pointed out that the Canberra Brave has filled every seat at the 3,000-seat AIS Arena in each of the last two seasons and wants to relocate to the city site.

Chief Minister Andrew Barr passed the detail to Annie de la Rue, who leads strategic infrastructure coordination for the Territory. She said the functional design brief was developed about two years ago and calls for 7,500 seats, rising to 9,000 for concerts.

The numbers

  • Design and costing stage: 18 months, during which the brief will be “re-interrogated”.
  • Current brief: 7,500 seats, with 9,000 capacity for concerts.
  • AIS Arena: 3,000 seats, full for every Brave game over two seasons.
  • NBL call: room for 8,000 or more, as put to the committee.

The Canberra Times reported that the stage will weigh the Brave’s sellouts and whether the city arena should become the team’s home. The newspaper also said a new report puts a value on Brave home games; that report’s figures were not available to read for this story.

What’s next

The re-test happens inside the reference design work, so any change to capacity would come out of that stage rather than from a separate decision. The report says the stage will also consider ice sports events.

The readable part of the report gives no arena cost, site boundary or build timetable. Developers and builders in Canberra should therefore treat the seat count as provisional until the 18-month stage reports back, and not lock in capacity-dependent plans before then.

Quick answers

What are the key numbers in this story?

design stage: 18 months; concert capacity: 9,000; AIS Arena seats: 3,000.

Where does this information come from?

This story cites The Canberra Times. Every source is linked on the page.

Sources

How we report →

Filed by the AusDev Canberra Desk. How we report.

Next story · CanberraBarr floats Bruce stadium for both oval and rectangular sportChief Minister Andrew Barr has signalled a Bruce stadium that could host oval and rectangular codes, while the Opposition says the idea targets the Civic bid.
Newsletter

Get the Canberra Daily Index

One free briefing every weekday morning.