Willetton Bunnings Warehouse rebuild lodged with panel at $54m
A $54 million plan for a multi-level Bunnings Warehouse with retail areas at 137 High Road, Willetton was received by the Metro Inner panel on 21 October 2026.

- Source Briefing
- Public record
A $54 million application to replace the existing development at 137 High Road, Willetton, with a multi-level Bunnings Warehouse has been lodged with a Development Assessment Panel (DAP), according to the state planning register.
The proposal is not approved. The register lists it only as a current application.
The news that moved today. Free email. Every weekday morning.
Why it matters
The register entry, reference DAP/26/03218, sits under the Metro Inner panel and the City of Canning. It was received on 21 October 2026.
The description reads as the demolition of the existing development and construction of a contemporary multi-level Bunnings Warehouse. It adds that the building would include retail areas, an outdoor nursery, an incidental cafe, a bagged goods canopy and customer parking.
The register does not say which Bunnings entity or consultant lodged it, and it gives no reasoning for the multi-level format.
The numbers
The register gives these details for the application:
- Cost: $54 million.
- Address: Lot 400, 137 High Road, Willetton.
- Type: Form 1 application.
- Received: 21 October 2026.
The register does not list a floor area, a store height, the number of levels or a trading date. It also leaves the confirmed meeting date blank, so no hearing has been scheduled in the version dated 16 November 2026.
What’s next
The register shows no confirmed meeting date, so a decision timeline cannot be stated.
The same register lists a separate proposal for 32 apartments, nine medical suites, three commercial tenancies and a supermarket on Canning Highway and Stock Road, Attadale, received on 16 October 2026. For another Perth retail redevelopment, see our report on the Morley Galleria stage one opening.
Quick answers
What are the key numbers in this story?
stated cost: $54m; application received: 21 Oct 2026; panel reference: DAP/26/03218.
Where does this information come from?
This story cites WA Planning, Development Assessment Panels: All Current Applications (16 November 2026), including the public record (WA Planning, Development Assessment Panels: All Current Applications (16 November 2026)). Every source is linked on the page.
On the record
All Current Applications, Report Version 0.105.4
WA Planning, Development Assessment Panels: All Current Applications (16 November 2026) · planning.wa.gov.au
Filed by the AusDev Perth Desk. How we report.