Thu, 26 Nov 2026

South Perth Esplanade $25m nine-home plan backed by panel

Staff recommended approval of nine South Perth Esplanade apartments valued at $25m for the 25 Nov Metro Inner panel; Business News reports it backed the plan.

Last verified · How we report · Report a correction

Illustration for: South Perth Esplanade $25m nine-home plan backed by panel
$25mproject value
9apartments

A $25 million, nine-apartment project at 11 South Perth Esplanade was before the Metro Inner Development Assessment Panel on Wednesday 25 November 2026, and Business News WA reports the panel backed it. City of South Perth staff had recommended approval, subject to conditions.

Why it matters

The panel’s agenda for meeting MIDAP/166 lists application DAP/26/03118 for nine multiple dwellings at Lot 38 (No. 11) South Perth Esplanade, South Perth. The City of South Perth is the responsible authority, and the owner is named as Sun Wai Holdings Pty Ltd. Planning Solutions is the applicant.

The approvals and deals moving Perth. Free, every weekday.

The agenda shows the City accepted the application on 26 May 2026. The report put to the panel is dated 13 November 2026 and replaces one prepared for the panel’s 30 September 2026 meeting. The agenda says only the newer report and its attachments should be relied on. Business News describes the 25 November result as coming two months after the plan was deferred.

An agenda recommendation is not a decision. The decision sits in the panel’s minutes, which we have not seen, so the approval rests on the Business News report, the free portion of which we have read.

The numbers

The agenda gives a development value of $25 million for the nine homes. The recommended conditions give a sense of what the City wanted built.

  • Every apartment must be certified at Silver level or better under the Liveable Housing Design Guidelines, both at the building permit stage and before occupation.
  • The development must reach a Four-Star Green Star Certified rating, and a supplementary equivalent standard is not accepted.
  • Parking must include at least one car bay per apartment, at least two visitor bays and a service bay for waste collection and deliveries.
  • The owner must put 1 per cent of the construction value towards public art, either as a payment to the City or as art on the site. The contribution is capped at $1 million.
  • A community benefit payment to the City is due before occupation, calculated under the City’s Local Planning Scheme No. 7.

What’s next

If the panel’s determination matches the staff recommendation, the conditions would apply from the date of approval. The recommended conditions say the approval lapses unless the development is substantially commenced within four years.

Several steps would follow before work starts. The conditions call for final materials and finishes, a detailed landscape plan and a construction management plan to be lodged with the City. A revised arborist report is also required to protect a Ficus macrocarpa growing next to the site, with limits on piling and excavation near its roots. A dilapidation report is required for neighbouring properties on South Perth Esplanade, Queen Street and Mill Point Road before works begin, and owners who agree must receive a copy.

The conditions also require the existing septic and effluent systems on the site to be pumped out and removed before construction, and a building permit application must come before work can start. We could not find a construction timeline or a sales launch date in the agenda.

Source: Planning WA; Business News WA.

For another Perth apartment approval this week, see Scarborough’s West Coast Highway project getting the green light.

Quick answers

What is the latest on Sun Wai Holdings?

Staff recommended approval of nine South Perth Esplanade apartments valued at $25m for the 25 Nov Metro Inner panel; Business News reports it backed the plan.

What are the key numbers in this story?

project value: $25m; apartments: 9.

Where does this information come from?

This story cites Planning WA, Metro Inner DAP agenda MIDAP/166 and Business News WA, including the public record (Planning WA, Metro Inner DAP agenda MIDAP/166). Every source is linked on the page.

On the record

The MIDAP/166 agenda lists DAP/26/03118, nine multiple dwellings at Lot 38 (No. 11) South Perth Esplanade, valued at $25 million, with the City of South Perth recommending approval subject to conditions.

Public record · planning.wa.gov.au

Also reported by

How we report →

Filed by the AusDev Perth Desk. How we report.

Next story · PerthPilbara Aboriginal groups get $20.8m for 21 homesOn 25 Nov the WA Government named four Aboriginal organisations sharing $20.8m to deliver 21 homes in Port Hedland, Tom Price, Karratha and Roebourne.
Newsletter

Get the Perth Daily Index

One free briefing every weekday morning.